
New Equipment and Methods for Flying Lead Installation
Dual HFL parking stands, Ufist ball fists and cable strapping plates: how Udeco made flying lead basket packing and installation faster and safer.
Read More

Fecamp Windmill Park Met Mast Tow-out and Installation
In year 2014-2015 Udeco seconded personnel to MT Hojgaard in Copenhagen for engineering management of the tow-out and installation part of the Fecamp Wind Park Met Mast Project offshore Normandy, France.
Read More

ROV Basket with Subsea PLR / Test / commissioning Manifold
In 2014, for the Aasgard Compression Project Udeco ‘developed’ the rental Subsea ROV Basket arrangement that included a high pressure PLR / test / commissioning manifold arrangement for the client Technip Norway.
Read More

Udecom Tie-in Spool – Single and Multibore Compact Spool
Prior to forming Udeco, the Udeco personnel had been working in lead engineering positions in Rockwater responsible for among other rigid driverless mono, dual and multi bore tie-in subsea spool designs.
Read More
.jpg)
14” Tie-in Spool Fabrication and Fast Landing Test
In the autumn of 2011, FMC awarded Udeco a contract for a fast landing test including required design work and fabrication of a 14” full scale Ucon tie-in spool inclusive of lift spreader arrangement.
Read More
.jpg)
Buoyancy based subsea equipment installation and retrieval tool
In 2011 Udeco designed, fabricated and shallow water tested a deep-water subsea buoyancy installation and retrieval tool arrangement for the client FMC (end user was Woodside Petroleum).
Read More

Udeco Extendable PLET Manifold for Stine Field Subsea Development
In the period from 2002 – 2005 Udeco personnel were seconded to Dong E&P A/S in Copenhagen, Denmark, for assistance in conjunction with the Stine Field Subsea Development Project.
Read More

Alternative to EFL Frames: Flying Lead Baskets
Installing EFL, HFL or OFL? One Udeco ROV basket holds up to five flying leads, so fewer lifts than one frame per lead. For hire worldwide.
Read More